Deployment Checklist

Pre-Shipment Phase

  • Hardware Specification: Verify that your servers/nodes are compatible with NVIDIA Hopper or Blackwell Architecture for high-density pods.
  • Power Requirements: Confirm your racks do not exceed 50 kW (scalable to 100 kW).
  • Connection Planning: Determine if you require single-phase 16A or 3-phase (32A) power outputs.
  • Network Strategy: Finalize your fiber requirements (up to 400G per thread) and whether you need Cerebro Fabric or Dark Fiber connects.

Logistics Phase

  • Documentation: Ensure all shipping manifests are directed to Hangargränd 1, 96150 Boden, Sweden.
  • Loading Dock Scheduling: Coordinate with on-site management for use of the large loading docks.
  • Security Clearance: Provide a list of authorized personnel with valid IDs for biometric and proximity card registration.

Installation Phase

  • Rack Mounting: Utilize our modular industrial racks for fast retrofits and upgrades.
  • PDU Setup: Configure Vertiv Geist intelligent PDUs for remote monitoring.
  • Cooling Integration: If using liquid-to-chip or immersion cooling, ensure your equipment is compatible with our RDHx or liquid cooling infrastructure.