Skip to main content

Power Infrastructure and Redundancy

Our power architecture is engineered to support mission-critical AI hardware, including NVIDIA Hopper and Blackwell architectures.

Substation and Distribution

  • Transformer Capacity: The facility features four main substations and three auxiliary substations, each providing 1.25 MVA.
  • Bus Bar Configuration:
    • Data Hall 1: 4 x 3-phase bus bars (250 kW each)
    • Data Hall 2: 2 x 3-phase bus bars (500 kW each).
  • Distribution Infrastructure: Power is delivered via APC Schneider Electric bus bars and Vertiv Geist intelligent PDUs.
  • Output Options: Supports 3-phase (3 x 32A or 2 x 32A) and 1-phase 16A outputs through single breaker outlets.

Backup and Protection

  • UPS Configuration: Isolated redundant systems provide $N+1$ protection for all critical loads.
  • Standby Generation: Dual 250 kW generators provide standby power redundancy ($N+1$).
  • Overvoltage Protection: Coarse protection is applied at the transformers, with medium protection maintained on all bus bars.